Wellington South Coast

 

Our latest intel is that Wellington City Council have engaged a contractor, and will be undertaking works to repair the track as far as Red Rock Point. From there to Devil’s Gate is pretty unaffected.

As shown in this pic, taken last month, the beach beyond is pretty much missing. But that’s quite a regular occurrence and some regular use should fix things.

This entry was posted in Members. Bookmark the permalink.